Our projects

Construction of the plant Kronospan OSB FLLC in Mogilev
  • Installation of cable routes and cable networks with a voltage of 0.4 kV, 0.69 kV, 10 kV between SwitchRoom and technological equipment;
  • Connection of step-down transformers 10kV/0.4 kV;
  • The power supply of compressor units Kaeser DSD238T SFC, DSD 202T;
  • Works on the tent warehouse power supply.
Construction of the plant Kronokhem LLC in Mogilev
  • Works on the power supply of the impregnation resin section;
  • Automation of the impregnation resin section;
  • Laying 10 kV cable line from 110/10kV electrical station to the plant Kronokhem, LLC;
  • Installation of the cable heating system of the plant Kronokhem, LLC (buildings 11,12,15,18, Bartek section, area of unloading);
  • Installation of capacities of reactors and metal structures while expanding the capacities of the plant Kronokhem, LLC
  • Installation of automatic gas control.
Construction of the plant Kronospan Steel Constructions LLC in Mogilev
  • Assembly and installation of metal structures of workshop No. 2;
  • Power supply, lighting, installation and commissioning and start-up of technological equipment during the construction of the workshop of metal structures No. 2;
  • Installation and connection of the KSC-2 workshop to the general power supply network from the RPZ of the plant Kronospan OSB, FLLC;
  • Installation of equipment and connection of devices in the manufacturing workshop KSC-2
Construction of the plant Mebeline FLLC in Mogilev
  • Relocation of 10 kV networks;
  • Installation of adapter couplings on a cable made of cross-linked polyethylene;
  • Arrangement of cable-conduit system 10 kV;
  • Connection of aspiration devices No. 1,2,3,4 and the technological silo device.
Construction of the plant Kronospan NT LLC in Smorgon, part of the facility
  • Construction of an MDF manufacturing line;
  • Distribution of 10 kV;
  • Installation of electric lighting
Construction of the plant VMG Industry, FLLC, “Reconstruction of the furniture manufacturing building, reconstruction of the warehouse of materials and finished products” in Mogilev
  • 1st stage of construction. Warehouse of 5 000 sq. m. Installation of fire alarms, electric lighting, electrical equipment, automation, and lightning protection
  • 2nd stage of construction. Warehouse of 10 000 sq. m. Installation of fire alarms, electric lighting, electrical equipment, automation, and lightning protection
  • 3rd stage of construction. Warehouse of 12 000 sq. m. Installation of fire alarms, electric lighting, electrical equipment, automation, and lightning protection
  • Connection of aspiration devices and technological equipment with a total capacity of 4 MW
  • Modernization of TP-12 and TP-13.
Construction of the facility “Establishment of an enterprise for the production of black carbon in the FEZ “Mogilev”, Mogilev District, Mogilev Region and the railway entrance to it”
  • Electrical power supply of RP-1, TP-1, TP-2, RTP-3, TP-4, TP-6;
  • Distribution of 10 kV;
  • Electric lighting of the site for preparation of hoppers; electrical power equipment;
  • The area of air receivers of measuring-and-recording instrumentation; grounding;
  • MTS of the warehouse. External deep grounding of the warehouse; electrical equipment, warehouse lighting
The plant Ultra Play LLC. Construction of a workshop for the production of veneer and plywood in Smorgon, Grodno Region. 1st stage of construction
  • Installation of an electric hot water system and thermal oil
  • Connection to the power supply network of the SPS;
  • Distribution of 10 kV from electrical substation No.110 of Ultra Play LLC to TP-1, TP-2, TP-3, TP-4, TP-5 in the cable-conduit system;
  • Installation of electric lighting.
  • Plant Ultra Play LLC. “Construction of surface water intake from the Viliya river for the technical needs of Kronospan, group of companies in Smorgon, Grodno Region”
  • Part of the facility: Installation and commissioning of KTP at the water intake.
The plant Naftan OJSC, Novopolotsk. “Construction of an elemental sulfur installation”, part of the facility: 1st stage of construction. Section Claus No. 100 (section S1)
  • Installation of a cable heating system.
Mogilevkhimvolokno OJSC. “Repair of the cable line 10 kV GPP “Water Intake No. 1”- electrical substation of the sanatorium “Sosny”
  • Repair of the cable line 0.4 kV from the overhead cable tray system P-226 to the ShchSU-0.4 kV.
Onega PALC “Construction of a plant for the production of raw potato chips in Minsk District”
  • Power supply, electric lighting, automation of production and storage facilities, ABA.
Region BioDevelopment CJSC “Construction of industrial premises for the utilization and processing of litter in the area of the village of Podbelie in Mogilev District of Mogilev Region”
  • Installation of a 10 kV cable line.
“Bykhovsky Forestry” SFE “Workshop for the production of cylindrical and barking products”
  • Construction site power supply;
  • Installation of street lighting.
Vysoky Zamok ALC
  • External communication networks.
Priortransagro PUE: “Construction of an electrical substation of a 10 kV network in the area of the agro-town Grozovo, Kopyl District”
  • Installation of a 10 kV network